Friday, July 13, 2018

New Things Coming To The 5th Floor

We are currently bursting at the seams, in regard to space.

One of the things that is being built, is an area for a 3rd control area, or switcher area...or something.

It has been set up in half of our maintenance shop.

Talk about losing a lot of space and the back way to get into our tape library.

It does look interesting and I can't wait to see what they end up doing with this set up...but wow.

No comments:

Post a Comment