Wednesday, September 10, 2008

Uplink Update


October 1st is our deadline to get an uplink operational, on the top of my office roof. Last Friday they placed a temp uplink on the roof and today, up went the structural steel that will hold the permanent uplink in place. They blocked part of my floor, to protect us, in case someone or something fell through the roof. The yellow tape gave me the hint that big stuff was going on above us. So I took a walk and documented it with my camera.

Exciting times coming soon.

No comments:

Post a Comment